About twenty team members, most in red Lunar Zebro jackets, pose in front of large IAC letters in a congress hall.

Team · 2026/27

The people building Lunar Zebro

Students from across TU Delft, with academic advisors and staff behind them. The team changes every year as members graduate and new ones join; the rover carries all of their work.

The team at the International Astronautical Congress · Paris, 2022 · Photo: Lunar Zebro

7
field campaigns, from lava tubes to mines, 2020–2022
40+
theses and papers about the rover
5
TU Delft faculties involved
37
students on the team in 2026

How we're organised

A small space company, with students in every seat

Each team owns one part of the rover, and the board makes sure the parts fit together.

Steer

Board

Project leader, chief engineer, internal affairs, treasurer and secretary. They set the year's goals, keep the planning and the budget, and decide when two teams need the same gram or the same watt.

Build

Engineering

Systems, electronics, software, structures, thermal, ground segment and assembly, integration and test. Each team designs its part, builds it and proves on the bench that it works.

Run

Operations

Public outreach, partner relations and the lab. They tell the mission's story, find and look after the partners who make it possible, and keep the lab working.

Research

Thesis and internships

Students who take one hard question and answer it properly: our research and development track, next to the build.

In 2026/27 a new leadership team leads the project with one clear focus: building the rover, starting with locomotion on Belka 3. The rover is built from modules so that this works: the legs, the power system, the computer and the radio can each be designed and tested by a different team at the same time, and handed on when a team graduates.

The 2026/27 team

Who does what

Management

  • Denis HabianChief Engineer
  • Ir. Stan BroereHead of Public Outreach
  • Ir. Prachi SachdevaHead of Partner Relations
  • Charlotte LehmannInternal Affairs
  • Rupak KundurLab Manager

Systems

  • Daniel Ghotb RazmjouSystems Engineer
  • Matyas ToulemondeSystems Engineer

Assembly, integration and test

  • Junxiang QiAIT Engineer
  • Dagmar ZegelAIT Engineer

Software

  • Youri KlaassensSoftware Lead
  • Timo van VeenEmbedded Software Lead
  • Bartek DudekEmbedded Software Engineer
  • Emma Chris AvramieaEmbedded Software Engineer
  • Azra OcakEmbedded Software Engineer
  • Martin JanmaatEmbedded Software Engineer
  • Timur MukminovEmbedded Software Engineer

Ground segment

  • Nicoleta DobricaFull-stack Developer
  • Grgur DujmovićFull-stack Developer
  • Riya GuptaFull-stack Developer
  • JakubFull-stack Developer
  • KacperFull-stack Developer

Electronics

  • Mick HuetingElectronics Lead
  • Matthias FransenElectronics Engineer
  • Micha PehlivanElectronics Engineer
  • Kelso LuckeElectronics Engineer

Structures

  • Jan ZuchowskiStructures Lead
  • Teo CokonajMechanical Engineer
  • Irina LeceaMechanical Engineer

Thermal

  • Justin ShiodaThermal Lead
  • Seiya TakadaThermal Engineer
  • DwayneThermal Engineer
  • VictorThermal Engineer

Public outreach

  • Justus JellemaWebsite Editor

Thesis and internships

  • MelleMSc thesis
  • Saroj ChandoesingInternship
  • Kameesh SaravananInternship
  • Oussama Al HadiInternship

Advisors

The people who ask the hard questions

The academic staff who supervise our theses and keep us honest. They don't build the rover: students do. They share what they know about robots, radiation, power and navigation.

Dr. Chris VerhoevenProject director; has led Zebro since the swarm robot began in 2013
Dr. Alessandra MenicucciRadiation research: REDMOON and radiation sensors
Dr. Raj Thilak RajanNavigation, swarms and AI
Dr. Arash NorooziAdvisor
Dr. Hans GoosenLegs, chassis and thermal design
Dr. Aditya ShekharPower electronics
Mladen GagicPower electronics
Visweswaran KarunanithiAdvisor
Laura BrunsSupport staff

Previous teams

Every year's team is part of the rover

Students have been building Lunar Zebro since 2017, and the Zebro robots since 2009. Every year left something behind: the first rovers, tested at ISRO in India; seven field campaigns; the radiation payload, tested at CERN; the pod that carries the rover on a lander. That is what this year's team builds on.

About forty team members, many in red Lunar Zebro jackets, pose together on a staircase lit in green.
The Lunar Zebro team, 2023 · TU Delft · Photo: Lunar Zebro
A group of about twenty students and staff stand together in an office, two of them holding small rovers.
The team in 2018 · TU Delft · Photo: Lunar Zebro

Earlier leads include Dr. Chris Verhoeven and operations manager Maneesh Kumar Verma; in 2024 Giannis Vardanikas led the project with Ataberk Ayata as chief engineer.

Recruiting 2026/27 · Public Outreach

Help us put a rover on the Moon

This year we're looking for students to join our Public Outreach team: writing, photography, video, social media and events. Students from every background, nationality and university are welcome.